News

01.30.15

CHPC Visits MyMicro Units In Production At Capsys

NeilDanielSarah at Capsys

CHPC touring the Capsys production line

On Thursday, January 29, 2015, CHPC visited the Capsys production site in the Brooklyn Navy Yard to see what’s currently rolling down the line–unit modules for the MyMicroNY apartment building that will go up in Manhattan this year!

We were joined by a cohort of graduate students from the Georgia Institute of Technology School of Architecture, led by Professor Michael Gamble. Gamble’s students are participating in a three-year initiative that synthesizes efficiency and innovative design.

2015 Capsys MyMicro shell

A MyMicro module at the start of the production line

Capsys specializes in modular building of various sizes and uses, from townhouses to supportive housing. Our group of visitors received an introduction to the MyMicro building from Capsys staff before enjoying a guided tour through the units currently in production. Each of the units, which will be studio apartments ranging in size from 270 to 350 square feet in size, takes about two weeks to complete from start to finish. Capsys predicts that once on-site construction begins, the building will be complete within two-and-one-half weeks.

2015 Capsys MyMicro almostfinished

A MyMicro module nearly finished in the factory

Later in the day, CHPC joined the Georgia Tech cohort at the showroom of Resource Furniture, which furnished the micro-unit of our Making Room museum exhibition and will be outfitting the MyMicro model unit. Deputy Director Sarah Watson provided the students with the background and principles of Making Room. With a clear picture of the types of households they are serving and the way those households are really living, the students have the best understanding of their needs. That way, they can design spaces that residents can use most effectively.

We are always excited to see Making Room principles in action, and our visit to Capsys offered a tangible result of our work.